[KR1] Network Maintenance [20202] [Complete]

Maintenance Number: 20202 Time: Jan 9, 2020  16:00 - 17:00 (HKT) Jan 9, 2020 17:00 - 18:00 (KST) Datacenter: Seoul 1, South Korea [KR1] Impacted Customers: All customers in Seoul 1, South Korea datacenter Expected Impact: Network will be disconnected for less than 30 minutes   Details: During the maintenance window, our upstream will ... Повеќе »

3рд Јан 2020
[SG1] Shutdown of Data Center Suites Electrical Equipment for Annual Maintenance [Complete]

Dear Valued Customer,   As part of annual maintenance, the following maintenance windows have been scheduled on electrical equipment associated to one of the DRUPS source. The maintenances will ensure the reliable and safe operation of HV switchboard, transformer and LV distribution panels.   Date: 12th September 2019 Maintenance Time: ... Повеќе »

5та Јун 2019
[HK4] Periodic Inspection, Testing and Certification (PITC) work [Complete]

The #1 maintenance window has been completed. ------ We have scheduled the following maintenance windows to switch the power source for single powered device. #1: 11:00 - 18:00 May 21 HKT #2: 11:00 - 18:00 Jun 5 HKT During the maintenance windows, impacted servers will be powered off, switched to alternative power source, and powered on. If ... Повеќе »

16та април 2019
[HK4] Server Power Maintenance [Complete]

Customer,

We will perform power maintenance on some servers in HK4 datacentre.

Date:  April 1st 10:00am-10:30am (GMT+8)

Impact: Normally there is no outage. Under extreme situation there will be interruption of less than 10 minutes.

Customers whose servers are involved in the maintenance will receive an Email.

29та Мар 2019