Please kindly be informed that HK2 (Shatin) datacentre will perform 5 years periodic inspection of LV fixed electrical installtion maintenance.

Location: HK2 (Shatin)

Maintenance Period (HKT, GMT+8):
1) For power source A: 09 Dec 2018 00:00 - 08:00
2) For power source B: 16 Dec 2018 00:00 - 08:00

Service Impacted: Devices with single power source connected to the specific power source. You will receive an Email if your devices are impacted.
Expected Impact: UPS and essential power will be cut off during the maintenance window. Outage is expected.

Please perform any necessary action in advance.

Wednesday, September 19, 2018

« 返回